Marl Coatings Heavy Duty High Impact Floor Paint

PU350 Supercoat Polyurethane Heavy-Duty High Impact Floor

This is our heavy-duty extreme use product not like our other floor paints that are for domestic and light industrial uses

Product performance outline:

To be suitable for use on factory floors industrial floor paints must generally be tough and resistant enough to withstand: –

The abrasion and wear that will take place i.e. from forklifts, pallet trucks, cars,4X4 plus other vehicle movements across the factory floor.

The static loading that is imposed on the painted factory floor surface by pallet stacking in storage, or other equipment on the floor

Most liquid or chemical spillages that may occur on the floor i.e. Water, oils, Cutting Agents, Soft acid cleaning agents, wheel/brake cleaners, engine coolant, brake fluids some fuel’s etc. that are used in the processes carried out on the painted floor.

(do not leave these to sit on the area coated they must be removed and not left to soak into the area, they will withstand the spill but not for long periods of time)

Most factory floors are reinforced concrete floors, and this must obviously have sufficient strength to support all of these loadings and uses.

The functions of the industrial floor paint are:

– to strengthen and improve the factory floor surface

– to eliminate dust, build up on surface (pre seal primer coating is always advised on dusty unpainted areas before a topcoat is applied)

– to increase the floors abrasion and wear resistance

– to provide the increased additional chemical resistance

– to improve the appearance and ambience of the working environment

-to speed up the cleaning/mopping of the area cutting down on time of this task and also to help combat dust issues on stock and surface contamination

– to delineate specific areas, such as: safe walking areas, parking bays or access routes and other directions etc.

Frequently Asked Questions

1.My floor is power-floated, or screed will this coating be ok.

This coating will be fine BUT the surface will need acid etching before a coating is applied.

2.My concrete slab has been down 4 weeks can I now paint it.

We advise a minimum cure time of 12 weeks before any coating is applied.

3.What is pre seal.

Pre seal is a primer coat to give better adhesion for the final floor paint finish giving a better life of coating.

4.Is this floor paint waterproof.

This coating does not offer any waterproof properties.

5.I want my floor to be high gloss will this coating get this finish.

This floor paint is not a high gloss standard finish is a semi-gloss, any high gloss coating will have a high slip hazard.

6.Will this coating fill gaps and cracks in the floor.

This floor paint will not fill gaps it may joint fine cracks, but we do recommend using a floor preparation filler to achieve a perfect finish.

7.Can pre seal be applied on top of the floor paint to give a gloss finish.

No pre seal is not a final topcoat and is it also not a clear coating.

8.We use bleach and industrial anti-bacterial floor soap will this paint stand up to this.

Yes, this floor paint will speed up the cleaning process as most materials cannot grip to the finished dry topcoat.

9.My floor is tiled will this coating stick.

If you have high gloss tiles this paint will not stick, if you have a matt finish this coating will be fine if the surface is clean and dry.

10.My floor is linoleum will this paint be ok.

This paint will not stick to lino or bitumen surfaces.

11.We are painting on Saturday will this paint be dry for Monday.

At 15’c this paint will be touch dry in 10 hours and threw dry after 24 hours, we recommend to apply in sections and keep off the fresh coated area for minimum 3 days, if temperature is lower than 15’c this will affect the cure times and thickness of application will slow cure time down, Two thin coats are better than one thick coat.

12.Can you help we have never painted a floor before what do we do

We are always happy to help and advice when needed, first we need to find out if the floor is a surface this paint will get along with luckily this paint gets on with the majority of surfaces brick, stone, metal, concrete, wood this coating will not stick to

power-float (shinny smooth finishes) without an acid etch preparation being done, once that has been identified we recommend to prep the floor with an acid etch or deep clean depending how contaminated the surface is, Pre seal is then applied when the cleaning stage has dried, leave 12 hours or until the pre seal is tack free you are then ready to apply your first neat coat of floor paint.

13.How do I work with the anti-slip additive on your drop-down menu?

This is a really simple process we can advise using this one of two ways first way mix the paint and apply this bag of dry additive directly to the tub on your first coating of the floor paint (after the cleaning/pre seal stages have been followed if required)leave this to then dry and apply a final lock in coat or on the first floor paint coating sprinkle this across the surface leave to dry brush away the excess and apply a final lock in coat.

please note the anti-slip additive is a single dry additive and will require a floor paint product to work.

Other helpful information.

Testing if the area is ready to coat with this type of professional coating

testing if a concrete surface is ready to coat (identifying a power floated or screed or other issue surface) this is a very simple process of putting a small amount of water on the surface you are looking to apply this range of floor coatings to ensure the area is clean and free from any contamination. If the water absorbs after a few minutes this area is ready for the cleaning & coating stages, we can advise if needed with this.

If the water sits on the surface and will not absorb and puddles this is a sign the area may require further preparation with acid etch or abrading. The acid etch process is a really easy application we can take you through this process step by step if required.

Dusty Unstable/Virgin Surfaces

For areas that are dusty and unstable, you will need a product that has been designed for maximum penetration while providing a good film build by re-bonding the substrate together, returning the floor to a solid sound surface the product we advise is Marl Coatings Pre Seal this can be found on the floor paint drop down menu.

Oily / Contaminated Surfaces

Where the floors have been subjected to oil and grease, We recommend steam cleaning your floors and use Marl Coatings Heavy Duty Surface Deep Clean before application of any floor coating, after allowing the surface to dry and Marl Coatings Pre Seal has been applied a top coat can then be applied please do test patches on each stage of this process.

Rising Damp

A floor coating does not do well if you have any moisture issues Hydrostatic pressure from the moisture can actually cause the coating to peel up, sometimes taking pieces of the concrete with it. Should floors be devoid of an effective Damp Proof Membrane (DPM), virtually any paint will lift and peel off the surface. Indeed, even self-levelling screeds can be pushed up by water pressure. This is another nightmare regularly experienced by many companies. For this reason, a damp-proof coating is recommended as a solution before applying a floor paint.

Treating your floor before coating them

It is important to treat your surfaces before coating them to prevent issues post-paint.

Repair your floor:

Before painting your garage floor, it is important to repair any cracks, holes or expansions of joints in your concrete to prevent an un-slightly finish to your flooring once its painted.

Marl Coatings Pre-Seal is designed to seal the surface from the outgassing of the concrete, where air will rise and be expelled from the concrete which is often caused by a rise in temperature or a change in humidity. Another major cause to poor flooring is rising damp. Due to a poor or non-existent DPM (Damp Proof Membrane), the damp is caused by a rising water table and/or the immediate surrounding areas being waterlogged.

Air entrapment is a common issue that can occur if the surface isn’t primed before being coated. This is where the air pushes bubbles into the resin coat which later bursts, leaving? craters? and? pin holes? in your floor paint. This can also be caused when the resin has been mixed too quickly it is important to use the correct tools to mix to avoid issues. Primer tackles this issue by soaking further into the surface to fully seal the entire surface area of concrete floors. Air is then less likely to push up, and on the rare occasion that it does, the bubble will pop and the resin now being thinner, will generally revert back and refill the pin hole caused by the bubble.

Product & Application information:

FOLLOW SOLVENT BASED PRODUCT DIRECTION FOR USE LEFT SIDE ON REAR OF CAN.

Product coverage rate:10m squared per litre or 107ft squared per litre

5 litre pack size should achieve 50m squared per 5 litre can or 538ft squared (one coat)

10 litre pack size should achieve 100m squared per 10 litre can or 1,076ft squared (one coat)

20 litre pack size should achieve 200m squared per 20 litre can or 2,152ft squared (one coat)

(Two thin Coats Always Advised giving adequate dry time between coats)

Dry time of coating using standard roller in areas with minimal air moisture (lab conditions)

Touch dry @ 15’c = 10/12 hours

First coat should be left to dry for 24 hours to assure adhesion to surface leave minimum of 24 hours for after coats always leaving minimum of 48 hours before 100% use of area again

true 100% cure will only be 7 days after application of last coating

(work in a well-ventilated area, using no forms of naked light/fire)

please test for damp before coating by applying a small test patch or applying a clear plastic sheet (30cmx30cm) and sealing it to the floor with a high grade tape (duct tape) without any ways of air escaping and leave for 24 hours if there is any forms of water vapor on the sheet they are will have damp and steps will need to be taken before coatings

Mix very well before use using a drill/paddle tool

If the area you are looking to coat is virgin (never been coated) or has had contamination from oil, grease, cutting agents etc, Cleaning with correct equipment/surface preparation products will be required.

The area will then need to be coated with a heavy duty pre seal and left to dry for 24 hours (you can purchase this pre seal on the drop-down menu)

Power floated/Screed areas (smooth shinny concrete) will need to be treated with an acid etch or abrade by mechanical means all product info will be displayed on the item you will take collection of

A test patch is always advised as some areas my still have contamination and this could have complications when coating

product weight

5 litre pack size 6kg minimum

10 litre pack size 12kg minimum

20 litre pack size 23kg minimum

Shipping Information: please see shipping option TAB at the top of this description.

A delivery surcharge will be applied to Northern Ireland, all of Isle of Wight, Isle of Man and Isle of Scilly and The Highlands and Islands and also the following area postcodes:- DD, DG, EH, FK, KA, KW, KY, ML, TD, AB,PA,PH (95% of these postcodes are 3/4 day service and priced at £12.99 per item)

IMPORTANT:

TO ENSURE DELIVERY EFFICIENCY

A CONTACT NUMBER IS REQUIRED AT TIME OF PURCHASE

please add number to “add note” on PayPal page just before clicking to pay

the delivery company will only try twice to deliver the goods (leaving a calling card to rearrange delivery both times)

if no one is at the address or do not contact them the item we be returned to us

A refund will be made deducting a £16.99 return fee (standard fee) some Scotland areas may be more all vans have cctv and tracking info for proof of delivery attempt

Other Important information:

Seller reserves right to cancel any purchase/payment and offer refund in full at any time

shade variation does & Can happen when orders are made at different times please make sure enough product is ordered at time of purchase

or keep a note of batch code from lid of can

PRE-SEAL ITEM IS An UNDERCOAT/SURFACE SEAL AND SHOULD ALWAYS BE OVER COATED WITH A FLOOR PAINT PRODUCT THE PRE-SEAL PRODUCT ON ITS OWN WILL NOT ACT AS A STABLE FLOOR COATING

Floor-paint Products are polyurethane heavy-duty high impact formulation and care should be taken when applied full safety data and coshh sheet can be requested

all images are for illustration purposes only including main images shade difference may happen from image to product

any further information can be requested via the message service or our contact us tab

Kind regards

Marl Coatings Ltd

All products are supplied and provided on the condition that we cannot be held responsible in the event they are used for any other purpose than that specified by the manufacturer,Marlcoatings shall not be liable to the customer in the event of damage to goods/property, injury to persons resulting from negligent or improper use/application or handling/advice of goods by the customer or their employees

Any recommendations and advice offered are given without legal responsibility. Marlcoatings shall not be liable to the customer in the event of damage to goods/property or injury to persons resulting from negligent or improper use/application or handling/or advice of goods by the customer, their employees or their agents or members of the general public, or any loss of profit or contracts or other consequential losses of any kind however caused.

To the extent permitted by applicable law, Marlcoatings disclaims all warranties, express or implied, as to the accuracy of the information contained in any of the materials on this website.

Marlcoatings shall not be liable to any person for any loss or damage which may arise from advice given or from the use of any of the information contained in any of the materials offered on this website.

 

Marlcoatings reserves the right to dispatch in any pack size available on listing for 20 litre orders we may send 4 x 5 litre packs or 2 x 10 litre packs if stock does not support 1 x 20 litre at that moment we will not contact to advise on this, buyers cannot request this and we do advise buying the correct pack size requested we do always aim to dispatch in ordered amount no extra cost will be to the buyer for this.
 
 

Related Products